Project Description

Clifton Park is a public site located on the east end of the Town limits. This project was to utilize a parcel donated to the town for use as a park and provide parking for town events. Located within an existing floodplain the design was prepared without any additional offsite fill material.

The project construct 23 parking spaces on pervious surface material and provided a SWM system under the parking area promoting infiltration.

The project was funded with TEA-21 funds and included 10’ asphalt trail with interruptive signage, connections to existing pedestrian system and site access.

J2E provided civil design, surveying/mapping, landscape design, environmental permitting, coordinated geotechnical and provide construction administration services.